When the mains can’t supply power anymore, the generating set starts and supplies energy within 1 minute under ideal circumstances. The generating set needs this time to start the fuel pump, preheat, check the engine’s protection systems and check the alternator’s voltages.
Preheating is warming up a diesel engine’s pre-combustion chamber.